TBEA: a service provider of systematic
solutions for global energy industry

TBEA Co., Ltd. (hereinafter referred to as “TBEA” or the “Company”) is an international service provider of system solutions for global energy industry, dedicated to green and low-carbon development, with more than 24,000 employees from 24 countries. The Company has 18 domestic industrial parks in China and 3 overseas manufacturing bases. As a large manufacturer of energy equipment and a national high-tech enterprise, the Company, in addition to manufacturing traditional energy equipment, is committed to developing new materials and new energy technologies, which is in line with China’s three emerging strategic industries, namely “high-end power T&D industry, renewable energy industry and new material industry”. In this regard, three subsidiaries have been listed, i.e. TBEA (stock code: 600089), Xinjiang Joinworld (stock code: 600888), and Xinte Energy (stock code: HK1799). TBEA has become a global leading enterprise in manufacturing of power transmission and distribution equipment with an annual transformer output of 260 million kVA, ranking first in the world. TBEA has also developed into a major export base of such new materials as poly-silicon and electronic aluminum products. Moreover, the Company has also evolved into a prominent provider of solar photovoltaic systems and wind power projects, ranking first in the world in terms of installed capacity for PV EPC projects for three consecutive years. What's more, TBEA has been ranked in top 100 international EPC contractors listed by ENR for four consecutive years.

Distribution of TBEA industry parks

The Company has 18 manufacturing industry parks in China and 3 bases abroad.

Northeast Industry Park (Liaoning))

South China Industry Park (Hunan)

Northwest Industry Park (Changji, Xinjiang)

North China Industry Park (Tianjin)

East China Industry Park (Shandong)

Southwest Industry Park (Sichuan) )

Beijing Turnkey Project General Contracting Company (Beijing)

Polycrystalline Silicon Industry Park (Xinjiang)

Xinjiang Renewable Energy Industry Park (Xinjiang)

Xi'an Electrical Technology Industry Park (Shaanxi)

Xinjiang Joinworld New Material Industry Park (Xinjiang)

Zhundong Coal Power Energy Base (Changji, Xinjiang)

India 765kV EHV Transformation and Transmission Industry Base

Tajikistan Energy Company

Nanjing Smart Electrical Engineering Industrial Park

YUNJI 5G Science and Technology Industrial Park

Wuqing Industrial Park

Smart Electrical Engineering Industrial Park

Xiong’an Science & Technology Park

International Logistics Park

Road of innovation for the preparation and manufacture of transmission and transformation (equipment)
It records the history of manufacture that we inherit China’ Transformer; from the birth of the first transformer in TBEA Shenyang till now, China’ Transformer has a history more than 80 years; as a participant, TBEA runs all the way up to now from the first equipment in China to the first one in the world.
1938
In 1938, TBEA developed the first power transformer in China
1938
1955
In 1955, TBEA developed the first 110kV transformer in China
1955
1959
In 1959, TBEA developed the first 220kV transformer in China
1959
1973
In 1973, TBEA developed the first 330kV transformer in China
1973
1979
1979, TBEA developed the first 500kV 1-phase on load tap changing transformer in China
1979
1998
In 1998, TBEA developed the first 1000kV test transformer in China
1998
2006
In 2006, TBEA developed the first 1000kV UHV AD transformer in the world
2006
2006
In 2006, TBEA developed the first 750kV electric reactor and expanded diameter conductors and buses in China
2006
2009
In 2009, TBEA developed the first ±800kV smoothing reactor in the world
2009
2009
In 2009, TBEA developed the first ±800kV UHV DC converter transformer in the world
2009
Honors and qualifications
  • Academician Workstation

  • Postdoctoral Science Research Workstation

  • Enterprise Technology Center

  • Engineering Laboratory

China National Science and Technology Progress Award

Ranking No. 228 in the World's top 500 mechanical companies
Ranking No.336 in China's top 500 enterprises
Annual transformer output ranked first in the world
Ranking No.155 in China's top 500 private enterprises
Ranking No.111 in Top 250 International Contractors listed by ENR

The Company invests 4% of yearly sales revenue into technological breakthroughs and innovations, and has built China’s unique UHV Transformer Engineering Technology Research Center which has become the innovation platform for R&D and manufacture together with the existing State-level Engineering Laboratory in the areas of power transmission and distribution, new energy and new materials, Enterprise Technological Center, Post-Doctoral Scientific Research Workstation and Academician Workstation. By undertaking more than 100 research and innovation projects in such national programs as National 863 High-tech Plan, key research and development plans and major local special projects, the Company has made technological breakthroughs in as many as 126 independent researches, among which, 65 breakthroughs take the lead in the world while the remaining 61 breakthroughs are in the lead in China. The Company has so far successfully applied for more than 1600 independent intellectual property rights, technological secrets, and software copyrights. The Company has also participated in formulating more than 210 domestic or world industrial standards.

The Company has won numerous prizes for its scientific and technological achievements, among which are 2 Grand Prize of the National Science and Technology Progress Award, 4 First Prize of the National Science and Technology Progress Award,3 Second Prize of the National Science and Technology Progress Award, 8 Grand Prize of Science and Technology Progress Award of China’s Machinery Industry and 238 relevant industry or provincial awards.

The development of TBEA has won high praises along the Belt and Road.

On December 30, 2020, TBEA and the Republic of the Gambia held an "online signing ceremony" for $23.05 million power transmission and transformation project.

On Oct. 14, 2016,Mr Xi Jinping, the President of China and Sheikh Hasina the Prime Minister of Bangladesh together witnessed the contract signing between TBEA and Dacca Distribution Company in Bangladesh on smart grid and upgrading project for Dacca, the capital of Bangladesh, amounting to over 11.1 billion RMB.

On November 21, 2017, TBEA started the construction of the 115kV power transmission and transformation project in Vientiane, the capital of Laos. The signing of the project is to further implement the important achievements of President Xi Jinping's visit to Laos and solidly promotes the construction of the “Belt and Road Initiative”.

The President of Kenyan Uhuru Kenyatta attended the inauguration of Nairobi Electrical Substation undertaken by TBEA in Kenya's capital, in May 2018.

On April 20, 2015, during his state visit to Pakistan, Xi Jinping, President of China, and Nawaz Sheriff, prime minister of Pakistan, jointly unveiled the nameplate of cooperation projects including the 100MW Photovoltaic Project of TBEA and Abubakar Jinnah Solar Energy Park of Pakistan.

On Sept. 13, 2014, during his state visit to Tadzhikistan, Xi Jinping, President of China, and Rakhmon, President of Tadzhikista, attended the completion and ignition ceremony of Stage I Project of Duschanbe No.2 Thermal Power Station and commencement foundation stone laying ceremony of Stage II Project, which was constructed by TBEA

On Dec. 8, 2016, Stage II project of Capital Thermal Power Plant in Duschanbe, Tadzhikistan was completed and put into operation; Rakhmon, President of Tadzhikista, and Yue Bin, Chinese ambassador to Tadzhikistan, attended the completion and ignition ceremony.

On Sept. 26, 2011, Khujand-Ayni 220kV power transmission and transformation project in Tadzhikistan was successfully put into debugging with 5 months ahead of schedule; Rakhmon, President of Tadzhikista, and Zhang Xin, the BOD Chairman of TBEA, jointly pushed the power on button.

On March 26, 2015, Togo “161/66/20kV S Socor Transformation Substation and Power Transmission Line Project” in Togo constructed by TBEA was completed. 。

TBEA adheres to the concept of harmonious development of employee-company win-win mode of “development on the employees and for the employees and sharing the fruit of development with employees”; human is the orientation; happiness of both material and spiritual culture of all employees is the target; the system where employees grow with the company and employees incomes grow with profit of the company has been established.

The science and technology R&D base in harmony with nature

The industry parks covered with green grasses

Attractive modern factories

Grand employees sports meeting

Employee team building activities

The group wedding held for employees

Joint performance of the Company

Joint performance of the Company

Refining the production and improving efficiency

The heart-shaped cake for a happy life

TBEA advocates harmonious development, adheres to the concept of benefiting the people where the projects and resources are located, fulfills its corporate social responsibilities. TBEA has invested a total 10 million of yuan in Central Asia, Africa, India and other places, to carry out public welfare undertakings at home and abroad. We help the poor, donate to improve education and infrastructure in Tajikistan, Kyrgyzstan, Angola, Zambia, India and other places where the company's projects are located, and helps the dropouts return to school. During the construction of overseas projects, we took the initiative to help the country train local talents, and was praised by the local people as "Bright Messenger" and model for spreading Chinese friendship.